Concrete cutting work on Mandorah Jetty involved working in a tight space to fix the track saw in place and prepare for concrete cutting and sawing.
Project Summary
Tight Work Upgrading Mandoroh Jetty in Darwin
Date: Sep 2011
Location: Mandorah Jetty, Dorwin NT
Client: Port of Darwin
Contractor: Wolpers Grahl / DEC Projects
Services utilised: Track Sawing.
The Project The structural integrity of the concrete jetty has been monitored over a number of years with vulnerable areas being fitted with Cathodic Protection to enhance the asset’s serve life. A recent survey of the jetty indicated further Cathodic Protection was required to ensure the structural integrity of the jetty. Super City was subcontracted to cut a slot 10mm wide and 50mm deep to the underside of the jetty surface.