Projects

Euroa Bridge

Project Summary

Bridge upgrade works with restricted access.

  • Date:    2011
  • Location: Euroa, Victoria
  • Client: Vic Roads
  • Contractor: DC Projects
  • Services utilised: Concrete Removal, Track Sawing, Wire Sawing, Core Drilling.
  • The Project
    Saw-cutting 31 opening pockets 400mm (H) x 450mm (L) x 320mm (W) into the existing bridge beam kerbing. Super City used a WX15 track saw to make two vertical cuts 320mm apart followed by one horizontal cut 450mm long to form each opening. The schedule provided for 12 working days and was completed in 9. Throughout the upgrade works, several agency inspectors visited the site to ensure safety and work procedures were being followed.
Download Case Study